Planning and
Building Current
Development Locations | Current
Development App. | Building
Moving Permits | Building
Standards | Commercial
and Multi-Family Residential New Construction
| Demolition Permits
| Building Permits
| Building/Fire
Code | Fire Code
| Grading Permits |
Land Clearing Permits
| Mechanical Permits
| Parking Standards
| Plumbing | Short
Subdivisions | Signs
| Single Family New Construction
| Steep Slopes | Utilities
| Variances | Wetlands
Management Requirements
Fire Code
105.2-1
General
A permit constitutes permission to maintain,
store, use or handle materials, or to conduct
processes which produce conditions hazardous
to life or property, or to install equipment
used in connection with such activities.
Such permission shall not be construed as authority
to violate, cancel, or set aside any of the
provisions of this code. Such permit shall
not take the place of any license required by
law.
3.40.010 GHMC Permit & Inspection Fees
There is hereby imposed a $47.00 inspection
fee for all inspections carried out pursuant
to the provisions of Section 105 of the Uniform
Fire Code. Permit amounts shall be as
stated in Tables 105-A, 105-B, 105-C.
When any occupancy requires multiple permits,
the Gig Harbor Fire Marshal shall charge the
highest of the several fees plus one-half of
all other required fees.
UNIFORM FIRE CODE PERMIT FEES
Automobile wrecking yard fee ................... $50.00
Burning in a public place (bonfires) ........... $10.00
Candles/open flame ............................. $10.00
Combustible fibre storage ...................... $25.00
Cryogens ....................................... $10.00
Dry cleaning plant ............................. $25.00
Dust producing operation ....................... $50.00
Flammable liquids:
Storage ....................................... $15.00
Storage tank installation or change content ... $15.00
Storage tank removal .......................... $15.00
Use ........................................... $15.00
Combustible liquids:
Storage ....................................... $10.00
Storage tank installation or change content ... $15.00
Storage tank removal .......................... $15.00
Use ........................................... $10.00
Flammable or combustible liquids pipe line ...... $50.00
Garages/vehicle repair .......................... $25.00
Hazardous material:
Store .......................................... $50.00
Transport ...................................... $10.00
Use ............................................ $25.00
Hazardous production material:
Store ......................................... $50.00
Transport ..................................... $10.00
Use ........................................... $25.00
Highly toxic pesticides/store ................... $50.00
Liquefied petroleum gas:
Install ........................................ $15.00
Operate ........................................ $15.00
Lumber yards/store lumber ....................... $50.00
Mall:
Covered for assembly ........................... $25.00
Covered for display/concession ................. $10.00
Covered for gas unit ........................... $10.00
Covered for kiosks ............................. $10.00
Covered for G.P.E. ............................. $10.00
Covered for open flame ......................... $10.00
Marinas/Boats/Slip/Wharves:
Cooking ........................................ $10.00
Open flame ..................................... $10.00
Matches/store ................................... $25.00
Nitrate film:
Store .......................................... $25.00
Use/handle ..................................... $10.00
Ovens, industrial ............................... $10.00
Place of assembly/operate ....................... $25.00
Radioactive material/store/handle ............... $50.00
Refrigeration equipment/install/operate ......... $10.00
Spraying/operate ................................ $50.00
Dipping/operate ................................. $25.00
Tent:
Erect .......................................... $25.00
Operate ........................................ $10.00
Welding/cutting/operate ......................... $50.00
See Ordinance # 599 for a complete
listing.
Date effective: 4/8/91 |