Building Permits
Why should I get a building permit?
A building permit entitles the applicant the right to inspections
to verify compliance with building codes and standards. State
and local codes were developed to provide for life safety, safeguarding
property and the protection of the public welfare.
What is a building permit?
A building permit is an official document issued by the building
official authorizing performance of a specified activity as defined
in Section No. 301, Uniform Building Code within the jurisdiction
of the City of Gig Harbor. The Department of Planning and Building
is the official department for processing building permit applications
within the City limits.
Do all development projects require building permits?
Any building or structure regulated by the Uniform Building Code
(UBC) as adopted by the City of Gig Harbor may not be erected,
constructed, enlarged, altered, repaired, moved, improved, converted
or demolished unless a separate permit for each building or structure
has first been obtained from the building official except as specified
within Section No. 301 (b), UBC. (IE: decks less than 30"
above grade, private storage buildings with a maximum projected
roof area of 120 square feet, painting and similar finish work)
Is a building permit difficult to obtain?
Activities which require building permits for other than single
family and duplex buildings usually (but not always) require other
city department plan review and permits. It is because of the
"multiple-departmental" nature of the permit that makes
it seem like a difficult process. However, if a complete and detailed
application meeting the requirements of each city departmental
review is submitted for processing, difficulties can be minimized.
See brochures that discuss other departmental plan reviews and
permits (IE: Site Plan, Conditional Use, Shorelines Management
Permits). It is important to remember that different state and
federal agencies may have additional application requirements
and review standards. You are strongly encouraged to contact these
agencies about their permitting requirements.
How long does it take to get a building permit?
After plans have been approved by other departments for Site Plan
compliance, etc., a building permit takes anywhere from 30-60
days to obtain. A building permit for a single family dwelling
usually takes 10-20 days.
How long is a building permit valid for?
The law provides that a building permit is valid for one year
from the "date of issuance" by the building official.
Substantial progress on construction must commence with 180 days
of the date of issuance or the permit may be voided by the building
official. A permit expires when one year has elapsed since the
permit was issued. A permit may be renewed at 1/2 the permit fee
if it has not expired . If the permit has expired the entire permit
fee must be paid at the current pemit fee rate.
What if I or someone else disagrees with the final decision
of the Building Official?
The Uniform Building Code provides for appeal of a decision by
the building official on building permits and inspections. Appeals
are filed with the City of Gig Harbor Building Code Advisory Board.
If a civil penalty order has been issued, the appeal must be filed
within 10 days of the date of the issuance of the civil penalty
order. Other appeals may be filed at any time. Details on filing
of appeals may be obtained from the City Building Official.
Other Standards which should be reviewed:
1. Building height standards
2. Minimum building setbacks
3. Building Design Review (IE: Entrance toward street; Elevations
reflect topography; Paint color; Roof slope, Roofing, Fencing,
Site develop., etc.)
4. Fire flow standards
5. Wetlands & slopes
6. Shoreline Management
7. Flood Plains
8. Public Works Standards
Other Fees and Utility Hook-up Fees:
1. Plumbing Permit
2. Mechanical Permit
3. Sanitary Sewer Hook-up
4. Water Meter Hook-up
5. Electrical Permit (WA State Labor & Industries)
6. Parks & Traffic Impact Fees
What if I have other questions?
Call: (253) 851-8136 a)
Building Construction
- Patty McGallian
b)
Zoning / Building Design
- Diane Gagnon
BUILDING PERMIT FEES
107.2
Building Permit Fees. The fee for each
permit shall be as set forth in Table 1-A
The determination of value or valuation under
any of the provisions of this code shall be made by the building
official. The value to be used in computing the building permit
and building plan review fees shall be the total value of all
construction work for which the permit is issued, as well as all
finish work, painting, roofing, electrical, plumbing, heating,
air-conditioning, elevators, fire-extinguishing systems and any
other permanent equipment. 107.2 Building
Permit Fees. The fee for each permit shall be as set forth in
Table 1-A
The determination of value or valuation under
any of the provisions of this code shall be made by the building
official. The value to be used in computing the building permit
and building plan review fees shall be the total value of all
construction work for which the permit is issued, as well as all
finish work, painting, roofing, electrical, plumbing, heating,
air-conditioning, elevators, fire-extinguishing systems and any
other permanent equipment.
TABLE 1-A -- BUILDING PERMIT FEES
|
TOTAL VALUATION |
FEE |
| $1.00 to $500.00 |
$23.50 |
| $501.00 to $2,000.00 |
$23.50 for the first
$500.00 plus $3.05 for each additional $100.00, or fraction
thereof, to and including $2,000.00 |
| $2,001.00 to $25,000.00 |
$69.25 for the first
$2,000.00 plus $14.00 for each additional $1,000.00, or fraction
thereof, to and including $25,000.00 |
| $25,001.00 to $50,000.00 |
$391.75 for the
first $25,000.00 plus $10.10 for each additional $1,000.00,
or fraction thereof, to and including $50,000.00 |
| $50,001.00 to $100,000.00 |
$643.75 for the
first $50,000.00 plus $7.00 for each additional $1,000.00,
or fraction thereof, to and including $100,000.00 |
| $100,001.00 to $500,000.00 |
$993.75 for the
first $100,000.00 plus $5.60 for each additional $1,000.00,
or fraction thereof, to and including $500,000.00 |
| $500,001.00 to $1,000,000.00 |
$3,233.75 for the
first $500,000.00 plus $4.75 for each additional $1,000.00,
or fraction thereof, to and including $1,000,000.00 |
| $1,000,001.00 and
up |
$5,608.75 for the
first $1,000,000.00 plus $3.65 for each additional $1,000.00,
or fraction thereof |
107.3 Plan Review Fees. When submittal documents are
required by Section 106.3.2, a plan review fee shall be paid at
the time of submitting the submittal documents for plan review.
Said plan review fee shall be 65 percent of the building
permit fee as shown in Table 1-A. The plan review fees specified
in this subsection are separate fees from the permit fees specified
in Section 107.2 and are in addition to the permit fees.
107.4 Expiration of Plan Review
Applications for which no permit is issued within 180 days following
the date of application shall expire by limitation, and plans
and other data submitted for review may thereafter be returned
to the applicant or destroyed by the building official.
Notes:
- All references to code sections are to the 1997 Edition of
the Uniform Building Code as adopted by the City of Gig Harbor
and the Washington State Building Code Council.
- See Section 106.4.4 for the expiration of building permits.
Permits expire one year after the issue date.
|